Building Owner: | Canopy Growth |
City / State: | Kirkwood, NY |
Construction Manager: | LeChase |
Specifier: | Sarnafil |
General Contractor: | LeChase |
Project Info: | Tear off roof system to metal deck, replace any deteriorated deck, install loose laid vapor barrier, install one layer of 3" iso, install one layer 2.5" HD iso, install new Sarnafil G410 self adhered membrane. |
Project Size: | 282,483 ft² |
Project Time Frame: | 2019-2020 |
Roof System: | Sika Sarnafil |
This project took place during the height of the COVID-19 pandemic. Our associates took extra precautions, wearing masks & face shields & placing extra wash stations around the job site. Deteriorated decking made for enhanced safety procedures. Roofing through the winter had its challenges, shoveling snow, removing ice, and learning to walk safely on frosted membrane.