Building Owner: | EarthCam, Inc. |
City / State: | Upper Saddle River, NJ |
General Contractor: | Hollister Construction Services, LLC |
Project Info: | Remove existing EPDM and replace with gray Sika Sarnafil S327 ENERGYSMART Membrane |
Project Size: | 11,522 ft² |
Project Time Frame: | Sping 2016 |
Roof System: | Sika Sarnafil |
This project proved to be challenging in the fact that the owner wanted a fresh look for the structure as their new HQ. This was achieved by the GC on record creating a vaulted front entry way and CFE, Inc. using their expertise to safely and accurately install the single ply roofing membrane on the topside of this new vaulted entrance area. We also removed a couple of old skylights and infilled with new decking as part of the re-roof phase of the main portion of roof.