Building Owner: | Village of Endicott |
City / State: | Endicott, NY |
Specifier: | The Smith Group |
Project Info: | Slice existing EPDM roofing, replace any wet insulation. Install new ½” high density insulation mechanically fastened through existing assembly to metal deck. Fully adhere new .060 Carlisle EPDM in Cav-Grip III adhesive. |
Project Size: | 14100 ft² |
Roof System: | Carlisle |
Our challenge was to keep the building and contents (books) dry. No leaks!
Brian Sewalt and the crew did a great job completing this project in a timely manner during a typical wet spring time. No leaks were reported in the building during the installation. Great care was taken installing the temporary tie-ins. We had several torrential downpours during the duration of the project with no issues!